Data Centre Construction
See how we can make your next project a success
Send us a message or give us a call to get started.
Data Centre Electrical Infrastructure & Construction
Powering Mission-Critical Infrastructure
Data centres require electrical infrastructure designed and constructed for reliability, scalability, efficiency, and continuous operation. Integral Energy Services Ltd. provides comprehensive electrical and instrumentation construction services to support the delivery of mission-critical data centre facilities.
From temporary construction power and electrical distribution through installation, testing, pre-commissioning and commissioning, and final turnover, our experienced teams work closely with clients, general contractors, engineers, and equipment vendors to safely execute complex electrical scopes while maintaining demanding project schedules.
Integral also supports design-build project delivery, working collaboratively with clients and project partners to integrate electrical design and construction requirements, identify constructability opportunities, and support efficient project execution from early planning through completion.
Data Centre Electrical Construction Services:
- Temporary construction power
- Medium and low-voltage power distribution
- Switchgear and electrical distribution equipment
- Transformers
- Automatic and static transfer switches (ATS/STS)
- Uninterruptible power supply (UPS) systems
- Power distribution units (PDUs) and remote power panels (RPPs)
- Busway and critical power distribution
- Generator and emergency power system integration
- Cable tray, conduit, raceway, and cable installations
- Grounding and bonding systems
- Lighting and lighting control systems
- Fibre optic and communications cabling
- Building and electrical control system integration
- EPMS, SCADA, and BMS integration support
- Modular electrical buildings and E-Houses
- Equipment installation and vendor coordination
- Testing and quality assurance/quality control
- Pre-commissioning and commissioning
- Load bank testing and start-up support
- Turnover documentation and project closeout
Data Centres: Construction Through Commissioning
Integral Energy provides continuity throughout the project lifecycle—from pre-construction planning and temporary power through installation, testing, energization, commissioning, and turnover.
Project Management of Data Centre Construction
Our Project Management, field supervision, QA/QC, and commissioning teams work collaboratively to identify critical project milestones, coordinate equipment and system interfaces, and support an efficient transition from construction to an operational facility.
Built for Critical Power
Reliability is fundamental to data centre operations. Integral brings extensive experience delivering complex electrical and instrumentation systems in industrial and commercial environments where safety, quality, schedule, and system reliability are critical.
Our experience with power distribution, switchgear, modular electrical buildings, controls, communications, testing, and commissioning provides a strong foundation for executing the demanding electrical infrastructure required by modern data centres.
Safety. Quality. Service.
Integral Energy is committed to providing industry-leading safety, quality, and service on every project. Our experienced management and field teams are equipped to support projects of varying size and complexity while maintaining a strong focus on safe execution, quality workmanship, productivity, schedule, and client requirements.
Whether supporting new data centre construction, expansion, upgrades, or commissioning activities, Integral Energy provides the electrical expertise and project execution capabilities required to help bring critical infrastructure online safely and successfully.

