Oil Sands & Refineries


Sulphur/Utilities 2020/2021 – Sustaining Capital Project


July 2020 – Ongoing
Hours-62,147


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.



SUG 2021 – Sustaining Capital Project


Jan 2021 – Ongoing
Hours-31,087


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.



Plant 54 - Upgrade Piping - EHT - Sustaining Capital Project


Jan 2021 – Ongoing
Hours-9,947


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Grounding, Heat Trace, Pre-Commissioning, Care & Preservation, Instrumentation.



Utility Water Line EHT 2020 - Sustaining Capital Project


July 2020 – Ongoing
Hours-9,947


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Grounding, Heat Trace, Pre-Commissioning, Care & Preservation, Instrumentation.



Modify Eductor Vent - Sustaining Capital Project


Sept 2020 – Ongoing
Hours-6,217


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Grounding, Heat Trace, Pre-Commissioning, Care & Preservation, Instrumentation.



SUG Summer Fall 2020 - Sustaining Capital Project


May 2020 – Feb 2021
Hours-7,461


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.



SUG Blower Building


June 2020 – Jan 2021
Hours-17,408


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, Instrumentation.



SUG/PUG 2020 Spring - Sustaining Capital Project


Feb 2020 – Dec 2020
Hours-1,991


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.



Utilities/SUG 2020 - Sustaining Capital Project


March 2020 – Dec 2020
Hours-1,865


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.



CNRL BPH AREA DDA2 FTS Project


Nov 2019 – Oct 2020
Hours-35,650


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings, HV Testing, Insulation, Fencing, Fiber Optic Installation and Terminations


CNRL DDA2 Dredge Assembly E&I


Feb 2020 – Oct 2020
Hours-14,750


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, HVAC, Care & Preservation, HV Testing, Insulation, Fiber Optic Installation and Terminations


Imperial Oil Ltd - Kearl Lake IP4 Pumphouse Project


Feb 2020 – May 2020
Hours-9,450


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC and SWR Installation


CNRL Horizon Minor Construction


Sept 2012 – Ongoing
Hours-5,703


Electrical & Instrumentation Construction:

  • Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Maintenance Work and Re-Work.


Husky Sustainability Projects / Maintenance


Aug 2015 – Dec 2019
Hours-257,559


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.


CNRL Albian Sands- Multiple – Major Projects, Sustaining Capital, Maintenance – 2019


Jan 2019 – Dec 2019
Hours-57,500


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.


CNRL E&I & EHT Plant 26 NRU Sparger & Plant 24 Warmwater Pump House Retrofit Projects


July 2019 – Dec 2019
Hours-10,000


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
  • Work performed was related to Pre-shutdown, Shutdown and Post-shutdown milestones



CNRL E&I EHT SUG SUP 2019


June 2019 – Dec 2019
Hours-10,000


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
  • Work performed was related to Pre-shutdown, Shutdown and Post-shutdown milestones


CNRL E&I EHT Rich Amine 2019


June 2019 – Dec 2019
Hours-7,550


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
  • Work performed was related to Pre-shutdown, Shutdown and Post-shutdown milestones


CNRL Crowsnest E-House Refurbishment Project


May 2019 – Sept 2019
Hours-2,758


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Low Voltage & Medium Voltage Electrical Equipment, HVAC & Grounding, DCS and PLC wiring, Subcontractor Management.


Imperial Oil Ltd - Kearl Lake West External Tailings Area – Reclaim Water System Relocation


Oct 2018 – Mar 2019
Hours-14,800


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety, Testing.
  • Relocation of Ehouses, trailing cables, on-water barges
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC and SWR Buildings.


CNRL Stage 1 Reliability Project


July 2018 – Dec 2018
Hours-19,300


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings.


CNRL Sustaining Capital Upstream Projects


March 2018 – Dec 2018
Hours-8,050


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.


Suncor Fort Hills – PFP Installation


Nov 2017 – Oct 2018
Hours-150,000



  • Passive fire protection installation with Advanced Insulation.
  • Installing PFP Insulation on all piping, tray systems, junction boxes, valves, and nozzles throughout Secondary Extraction.


CNRL Albian Electrical Construction


March 2018 – June 2018
Hours-7,787


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Grounding, Glanding and Terminating, Installation of Electrical Equipment, Fire Alarm, Fibre Optic, HV Testing Pre-Commissioning, Care & Preservation, MCC/Controls.


CNRL MRM Areas 250 & 270 Fire and Gas Update


March 2018 – May 2018
Hours-3,850


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Grounding, Glanding and Terminating, Fibre Optic, Fire & Gas Instrument Installation, Pre-Commissioning, Care & Preservation, MCC/Controls.


CNRL Basal Water Disposal Debottlenecking Project (BWDD)


April 2017 – March 2018
Hours-3,150


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Fibre Optic, Instrumentation Installation and testing, Pre-Commissioning, Temp Power, MCC Buildings, Commissioning Assistance


CNRL E&I New Facilities and Existing Plant Reconfiguration


Oct 2015 – Dec 2017
Hours-239,757


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.


CNRL Plant 42/43


Aug 2017 – Dec 2017
Hours-5,592


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.


KBR Suncor Fort Hills Secondary Extraction


Oct 2015 – Dec 2017
Hours-978,517


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Telecom, Temp Power, MCC Buildings.
  • Installation of 1,500 linear meters of DarmaTech Insulation


CNRL MFT (Mature Fine Tailings) Main E&I Project


Feb 2017 – Nov 2017
Hours-74,870


Electrical & Instrumentation Construction:

  • Project Management, Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.


CNRL Hydrotreaters


Sept 2016 – Oct 2017
Hours-357,677


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, HV Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power & Preservation, MCC Buildings, Insulation Works; Installation of 10,000 linear meters of Calcium Silicate and Mineral Wool Insulations


CNRL Sulphur Block Facilities Expansion


Feb 2017 – Sept 2017
Hours-20,707


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, Grounding, Heat Trace, Pre-Commissioning, Temp Power, MCC Sections


NWR Sturgeon Refinery Project


May 2015 – Nov 2016
Hours-238,050


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Pre-Commissioning, Temp Power, Civil, Care & Preservation, MCC Buildings.


CNRL HT 4&5 Pumphouses


Oct 2015 – Aug 2016
Hours-22,056


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power


Statoil Leismer Maintenance Capital


Apr 2009 – Dec 2015
Hours-36,020


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning


CNRL – TTP (Tailings Transfer Plant) Project


Aug 2014 – Nov 2015
Hours-122,484


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, Care & Preservation, MCC Buildings.


CNRL MFT (Mature Fine Tailings) Substation Project


June 2015 – Oct 2015
Hours-20,325


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, Care & Preservation, MCC Buildings.


CNRL MFT (Mature Fine Tailings) Dewatering Project


June 2015 – Aug 2015
Hours-10,200


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Pre-Commissioning, Temp Power.


Husky Sunrise Central Processing Facility


June 2012 – Aug 2015
Hours-909,677


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, and Commissioning.


CNRL Horizon Extraction Plant 24, Phase 3 & 4


Oct 2013 – Aug 2015
Hours-584,792


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Civil, HVAC.


CNRL Field Construction Mod 52/54 Reboilers Exchangers Project


Sept 2014 – Aug 2015
Hours-10,695


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Grounding, Fibre Optic Heat Trace, Pre-Commissioning


CNRL R-73 Retrofit Trains 1 & 2


Aug 2014 – Aug 2015
Hours-50,747


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Civil, HVAC.


Husky Sunrise Sulphur Recovery Unit


Aug 2014 – March 2015
Hours-40,398


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Heat Trace, Pre-Commissioning, Instrument Installation.


Blackgold Central Processing Facility


Apr 2013 – Feb 2015
Hours-354,241


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, MCC Buildings, Pre-Commissioning, Commissioning, Temp Power, Care & Preservation.


Kiewit Mildred Lake Mine Relocation – Process Water


Feb 2014 – Sept 2014
Hours-55,566


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Heat Trace, MCCs, Instrumentation, Pre-Commissioning, Temp Power, Care & Preservation.


CNRL Horizon Sulpher Recovery Unit


Nov 2012 – June 2014
Hours-196,740


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning.


Statoil Leismer SDB-RLD (Steam Debottleneck-Reduced Liquid Discharge)


Jan 2013 – Dec 2013
Hours-83,438


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning


Krupp Canada - Kearl Oil Sand - Ore Preparation Plant (OPP)


April 2011 – March 2013
Hours-159,492


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning.


Kearl Lake Froth Treatment


April 2011 – Jan 2013
Hours-107,823


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning.


Krupp Canada - CNRL Horizon Ore Preparation Plant (OPP)


July 2010 – Jan 2012
Hours-129,673


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, E-Houses, Fire Alarm, Heat Trace, Pre-Commissioning & Commissioning.


Saipem Hydro Transport Line


Dec 2010 – Sept 2011
Hours-15,114


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning.


Statoil Leismer Demonstration Plant – CPF & WellPads


April 2009 – Nov 2010
Hours-391,699


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning & Commissioning.


Suncor-Firebag-3 Sulphur Recovery Unit Cable Pull


Apr 2009 – July 2009
Hours-35,529


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable, Glanding, Fibre Optic, HV Termination & Pre-Commissioning.


CNRL Horizon Secondary Upgrader


June 2006 – Feb 2009
Hours-447,916


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning.


CNRL Basal Water Aquifer


Jan 2008 – June 2008
Hours-19,800


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Civil, HVAC.


CNRL Extraction- E & I – Horizon Phase 1


Nov 2006 – Feb 2008
Hours-220,892


Electrical & Instrumentation Construction:

  • Project Management; Project Planning, Procurement, Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Commissioning.


CNRL Horizon Secondary Upgrader Temp Power - E & I Construction


May 2006 – Jan 2008
Hours-80,298


Electrical & Instrumentation Construction:

  • Quality & Safety.
  • Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning.