View our Current and Past Projects Oil Sands & Refineries Sulphur/Utilities 2020/2021 – Sustaining Capital ProjectJuly 2020 – Ongoing Hours-62,147
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.
SUG 2021 – Sustaining Capital ProjectJan 2021 – Ongoing Hours-31,087
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.
Plant 54 - Upgrade Piping - EHT - Sustaining Capital ProjectJan 2021 – Ongoing Hours-9,947
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Grounding, Heat Trace, Pre-Commissioning, Care & Preservation, Instrumentation.
Utility Water Line EHT 2020 - Sustaining Capital ProjectJuly 2020 – Ongoing Hours-9,947
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Grounding, Heat Trace, Pre-Commissioning, Care & Preservation, Instrumentation.
Modify Eductor Vent - Sustaining Capital ProjectSept 2020 – Ongoing Hours-6,217
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Grounding, Heat Trace, Pre-Commissioning, Care & Preservation, Instrumentation.
SUG Summer Fall 2020 - Sustaining Capital ProjectMay 2020 – Feb 2021 Hours-7,461
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.
SUG Blower BuildingJune 2020 – Jan 2021 Hours-17,408
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, Instrumentation.
SUG/PUG 2020 Spring - Sustaining Capital ProjectFeb 2020 – Dec 2020 Hours-1,991
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.
Utilities/SUG 2020 - Sustaining Capital ProjectMarch 2020 – Dec 2020 Hours-1,865
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings, Instrumentation.
CNRL BPH AREA DDA2 FTS ProjectNov 2019 – Oct 2020 Hours-35,650
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings, HV Testing, Insulation, Fencing, Fiber Optic Installation and Terminations
CNRL DDA2 Dredge Assembly E&IFeb 2020 – Oct 2020 Hours-14,750
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, HVAC, Care & Preservation, HV Testing, Insulation, Fiber Optic Installation and Terminations
Imperial Oil Ltd - Kearl Lake IP4 Pumphouse ProjectFeb 2020 – May 2020 Hours-9,450
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC and SWR Installation
CNRL Horizon Minor ConstructionSept 2012 – Ongoing Hours-5,703
Electrical & Instrumentation Construction:
- Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Maintenance Work and Re-Work.
Husky Sustainability Projects / MaintenanceAug 2015 – Dec 2019 Hours-257,559
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
CNRL Albian Sands- Multiple – Major Projects, Sustaining Capital, Maintenance – 2019 Jan 2019 – Dec 2019 Hours-57,500
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
CNRL E&I & EHT Plant 26 NRU Sparger & Plant 24 Warmwater Pump House Retrofit ProjectsJuly 2019 – Dec 2019 Hours-10,000
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
- Work performed was related to Pre-shutdown, Shutdown and Post-shutdown milestones
CNRL E&I EHT SUG SUP 2019 June 2019 – Dec 2019 Hours-10,000
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
- Work performed was related to Pre-shutdown, Shutdown and Post-shutdown milestones
CNRL E&I EHT Rich Amine 2019 June 2019 – Dec 2019 Hours-7,550
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
- Work performed was related to Pre-shutdown, Shutdown and Post-shutdown milestones
CNRL Crowsnest E-House Refurbishment ProjectMay 2019 – Sept 2019 Hours-2,758
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Low Voltage & Medium Voltage Electrical Equipment, HVAC & Grounding, DCS and PLC wiring, Subcontractor Management.
Imperial Oil Ltd - Kearl Lake West External Tailings Area – Reclaim Water System RelocationOct 2018 – Mar 2019 Hours-14,800
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety, Testing.
- Relocation of Ehouses, trailing cables, on-water barges
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC and SWR Buildings.
CNRL Stage 1 Reliability ProjectJuly 2018 – Dec 2018 Hours-19,300
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Care & Preservation, MCC Buildings.
CNRL Sustaining Capital Upstream ProjectsMarch 2018 – Dec 2018 Hours-8,050
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
Suncor Fort Hills – PFP InstallationNov 2017 – Oct 2018 Hours-150,000
- Passive fire protection installation with Advanced Insulation.
- Installing PFP Insulation on all piping, tray systems, junction boxes, valves, and nozzles throughout Secondary Extraction.
CNRL Albian Electrical ConstructionMarch 2018 – June 2018 Hours-7,787
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Grounding, Glanding and Terminating, Installation of Electrical Equipment, Fire Alarm, Fibre Optic, HV Testing Pre-Commissioning, Care & Preservation, MCC/Controls.
CNRL MRM Areas 250 & 270 Fire and Gas UpdateMarch 2018 – May 2018 Hours-3,850
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Grounding, Glanding and Terminating, Fibre Optic, Fire & Gas Instrument Installation, Pre-Commissioning, Care & Preservation, MCC/Controls.
CNRL Basal Water Disposal Debottlenecking Project (BWDD)April 2017 – March 2018 Hours-3,150
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Fibre Optic, Instrumentation Installation and testing, Pre-Commissioning, Temp Power, MCC Buildings, Commissioning Assistance
CNRL E&I New Facilities and Existing Plant ReconfigurationOct 2015 – Dec 2017 Hours-239,757
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
CNRL Plant 42/43Aug 2017 – Dec 2017 Hours-5,592
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
KBR Suncor Fort Hills Secondary ExtractionOct 2015 – Dec 2017 Hours-978,517
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Telecom, Temp Power, MCC Buildings.
- Installation of 1,500 linear meters of DarmaTech Insulation
CNRL MFT (Mature Fine Tailings) Main E&I ProjectFeb 2017 – Nov 2017 Hours-74,870
Electrical & Instrumentation Construction:
- Project Management, Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, HVAC, Care & Preservation, MCC Buildings.
CNRL HydrotreatersSept 2016 – Oct 2017 Hours-357,677
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, HV Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power & Preservation, MCC Buildings, Insulation Works; Installation of 10,000 linear meters of Calcium Silicate and Mineral Wool Insulations
CNRL Sulphur Block Facilities ExpansionFeb 2017 – Sept 2017 Hours-20,707
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, Grounding, Heat Trace, Pre-Commissioning, Temp Power, MCC Sections
NWR Sturgeon Refinery ProjectMay 2015 – Nov 2016 Hours-238,050
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Pre-Commissioning, Temp Power, Civil, Care & Preservation, MCC Buildings.
CNRL HT 4&5 PumphousesOct 2015 – Aug 2016 Hours-22,056
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power
Statoil Leismer Maintenance CapitalApr 2009 – Dec 2015 Hours-36,020
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning
CNRL – TTP (Tailings Transfer Plant) ProjectAug 2014 – Nov 2015 Hours-122,484
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, Care & Preservation, MCC Buildings.
CNRL MFT (Mature Fine Tailings) Substation ProjectJune 2015 – Oct 2015 Hours-20,325
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Temp Power, Civil, Care & Preservation, MCC Buildings.
CNRL MFT (Mature Fine Tailings) Dewatering ProjectJune 2015 – Aug 2015 Hours-10,200
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Pre-Commissioning, Temp Power.
Husky Sunrise Central Processing FacilityJune 2012 – Aug 2015 Hours-909,677
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, and Commissioning.
CNRL Horizon Extraction Plant 24, Phase 3 & 4Oct 2013 – Aug 2015 Hours-584,792
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Civil, HVAC.
CNRL Field Construction Mod 52/54 Reboilers Exchangers ProjectSept 2014 – Aug 2015 Hours-10,695
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Grounding, Fibre Optic Heat Trace, Pre-Commissioning
CNRL R-73 Retrofit Trains 1 & 2 Aug 2014 – Aug 2015 Hours-50,747
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Civil, HVAC.
Husky Sunrise Sulphur Recovery UnitAug 2014 – March 2015 Hours-40,398
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Heat Trace, Pre-Commissioning, Instrument Installation.
Blackgold Central Processing FacilityApr 2013 – Feb 2015 Hours-354,241
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, MCC Buildings, Pre-Commissioning, Commissioning, Temp Power, Care & Preservation.
Kiewit Mildred Lake Mine Relocation – Process WaterFeb 2014 – Sept 2014 Hours-55,566
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Heat Trace, MCCs, Instrumentation, Pre-Commissioning, Temp Power, Care & Preservation.
CNRL Horizon Sulpher Recovery UnitNov 2012 – June 2014 Hours-196,740
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning.
Statoil Leismer SDB-RLD (Steam Debottleneck-Reduced Liquid Discharge)Jan 2013 – Dec 2013 Hours-83,438
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning
Krupp Canada - Kearl Oil Sand - Ore Preparation Plant (OPP)April 2011 – March 2013 Hours-159,492
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning.
Kearl Lake Froth Treatment April 2011 – Jan 2013 Hours-107,823
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning.
Krupp Canada - CNRL Horizon Ore Preparation Plant (OPP)July 2010 – Jan 2012 Hours-129,673
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, E-Houses, Fire Alarm, Heat Trace, Pre-Commissioning & Commissioning.
Saipem Hydro Transport LineDec 2010 – Sept 2011 Hours-15,114
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning.
Statoil Leismer Demonstration Plant – CPF & WellPadsApril 2009 – Nov 2010 Hours-391,699
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Ehouses, Fire Alarm, Heat Trace, Pre-Commissioning & Commissioning.
Suncor-Firebag-3 Sulphur Recovery Unit Cable PullApr 2009 – July 2009 Hours-35,529
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable, Glanding, Fibre Optic, HV Termination & Pre-Commissioning.
CNRL Horizon Secondary UpgraderJune 2006 – Feb 2009 Hours-447,916
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning.
CNRL Basal Water AquiferJan 2008 – June 2008 Hours-19,800
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Civil, HVAC.
CNRL Extraction- E & I – Horizon Phase 1Nov 2006 – Feb 2008 Hours-220,892
Electrical & Instrumentation Construction:
- Project Management; Project Planning, Procurement, Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning, Commissioning.
CNRL Horizon Secondary Upgrader Temp Power - E & I ConstructionMay 2006 – Jan 2008 Hours-80,298
Electrical & Instrumentation Construction:
- Quality & Safety.
- Installation of Cable Tray, Cable, Lighting, Fibre Optic, High Voltage Terminations, Grounding, Fire Alarm, Heat Trace, Pre-Commissioning.
|